Kaohsiung/Light Rail

From OpenStreetMap Wiki
Jump to navigation Jump to search

Kaohsiung LRT is the first light rail in Taiwan.

Track

The Circular Line got completed in January 2024.

Use railway=light_rail and draw single line. (Draw two separate lines between platform when phase2 has been constructed.)

Key Value Discussion
railway light_rail Mandatory.
name 高雄環狀輕軌 Mandatory and don't change.
name:en Kaohsiung LRT As above.
operator unknown Fill it when operator evaluation is ended.
operator:en unknown As above.
electrified yes Use ACR technology to supply power.
gauge 1435 Standard gauge.
voltage 750
frequency 0 Use DC to power.
railway level_crossing Level crossing with roads.

Stop

Use as same as railway=tram_stop.

The stop point should point on platform line elements.

Key Value Discussion
railway tram_stop Mandatory.
name XX (例.哈瑪星高雄港) Local name of stops.
name:en XX (Ex.Hamaseng Kaohsiung Port) English name of stops
ref CXX (Ex.C14) Reference Number of Stop
operator unknown Fill it when operator evaluation is ended.
operator:en unknown As above.
public_transport stop_position Optional.

Platform

Key Value Discussion
railway platform Mandatory.
public_transport platform Optional.

Route

complete here when LRT operation.

Reference

Circular Line (KMRT) on Wikipedia