Kaohsiung/Light Rail
Jump to navigation
Jump to search
Kaohsiung LRT is the first light rail in Taiwan.
Track
The Circular Line got completed in January 2024.
Use railway=light_rail and draw single line. (Draw two separate lines between platform when phase2 has been constructed.)
Key | Value | Discussion |
---|---|---|
railway | light_rail | Mandatory. |
name | 高雄環狀輕軌 | Mandatory and don't change. |
name:en | Kaohsiung LRT | As above. |
operator | unknown | Fill it when operator evaluation is ended. |
operator:en | unknown | As above. |
electrified | yes | Use ACR technology to supply power. |
gauge | 1435 | Standard gauge. |
voltage | 750 | |
frequency | 0 | Use DC to power. |
railway | level_crossing | Level crossing with roads. |
Stop
Use as same as railway=tram_stop.
The stop point should point on platform line elements.
Key | Value | Discussion |
---|---|---|
railway | tram_stop | Mandatory. |
name | XX (例.哈瑪星高雄港) | Local name of stops. |
name:en | XX (Ex.Hamaseng Kaohsiung Port) | English name of stops |
ref | CXX (Ex.C14) | Reference Number of Stop |
operator | unknown | Fill it when operator evaluation is ended. |
operator:en | unknown | As above. |
public_transport | stop_position | Optional. |
Platform
Key | Value | Discussion |
---|---|---|
railway | platform | Mandatory. |
public_transport | platform | Optional. |
Route
complete here when LRT operation.
Reference
Circular Line (KMRT) on Wikipedia